Power shutdown

Home » Kashmir » Power shutdown

By Fast Kashmir on 20/11/2017.

SRINAGAR, NOV 20:  According to the Power Controller, Kashmir Province, PDD Srinagar, in order to carry out urgent maintenance works, power supply from the grid station 132/33KV Badampora and132/33KV Habbak Badampora Kangan S/C transmission line onNovember 23 from 9 am to 5 pm and from 132/33KV Badampora-Kangan S/C transmission Line on November 27 from 9 am to 5 pm.