Power shutdown

Home » Kashmir » Power shutdown

By GNS on 04/01/2019.

Power shutdown

Srinagar, Jan 04: According to Chief Engineer, EM&RE wing, Kashmir, the 33 KV Habak-Ganderbal line will remain shutdown on 5th , 7th, and 9th January 2019 from 10 am to 2.30 pm to carry out necessary stabilization and branch cutting programme.

Loading...